Google PlayApp Store
Įveskite „iš kur“ ir „kur“, kad paieška veiktų
pirm. sek.
pask.
pirm. sek.
pask.

Rodo autobusus, troleibusus ir tramvajus per GPS

Prisijungę atnaujinimai realiu laiku
Palaikymas visiems šiuolaikiniams įrenginiams

Paslauga rodo autobusų, troleibusų ir tramvajų buvimo vietą per GPS/GLONASS palydovinio pozicionavimo sistemą. Galite sužinoti, kur važiuoja viešasis transportas ir nuspręsti, kada eiti į stotelę.




1
2
3
4
5
6
7
8
9
0
paslėpti
splash
ERR
Transporto pranešimai
pradžia - pabaiga / header / cause / effectdescription
-

Starting Monday, March 16, Sound Transit will close Kent Station’s northwest Sounder surface parking lot.


NoneNone
The only available spots for this lot will be three ADA parking spots. This closure will last the duration of this project phase. We expect this phase to be completed in December 2026. We encourage drivers to use the existing Kent garage at W Smith St and 1st Ave N. <br><br>For more information on the project, visit the Kent Station Parking and Access Improvement Project page. <br>

Traukinys S Line
-

From Tuesday, Sept. 8, through Friday, Oct. 2, from 6 a.m. to 5 p.m. daily, sidewalk revision work will take place at 77th Ave SE near the west entrance to Mercer Island Station.


NoneNone
This work will take place outside the west entrance of 77th Ave SE. The sidewalk will be closed to northbound traffic during working hours, including the drop-off/pick-up location. <br><br>The sidewalk to the north of this entrance will be closed for the duration of the project, so passengers can only access this entrance from the south.

Tramvajus 2 Line
-

Sound Transit is testing real-time Sounder arrival information on overhead signs.


NoneNone
Real-time arrival information is being tested on signs at Sounder stations. At times, signs may display inaccurate information due to testing. Trip planner data may also be inaccurate during this time; Sounder schedules are the most reliable source of information about arrival times.

Traukinys N LineTraukinys S Line
-

Beacon Hill Station - Elevator 4 unavailable until further notice due to testing.


NoneNone
Please use the adjacent in-service elevators to ride the 1 Line and exit the station.

Tramvajus 1 Line
-

From Aug. 10, 2026, through Feb. 15, 2027, parking capacity will be reduced at Kent Sounder Station Garage due to construction.


NoneNone
Passengers can still park at the garage and access the Kent Sounder Station during construction. <br>The project will repair and improve the concrete structure of the garage. <br><br>8/10/26 – 9/14/26: Parking level 5 will be closed. Updates to follow when available. <br><br>We apologize for any inconvenience. Subscribe to rider alerts for any changes.

Traukinys S Line
-

From Jul. 22 through Sept. 30, Tukwila International Boulevard Station will have reduced parking capacity due to construction. Passengers may use Angle Lake Station for additional parking.


NoneNone
Passengers can still access Tukwila International Boulevard Station during construction. <br><br>The project will improve the drainage system for this station's stairwells. <br><br>Parking capacity will be reduced due to equipment storage. Additional parking spaces can be found at Angle Lake Station. <br><br>We apologize for any inconvenience. Subscribe to rider alerts for any changes. <br>

Tramvajus 1 Line
-

Bellevue Downtown Station - Elevator 6 unavailable until further notice due to unscheduled outage.


NoneNone
To ride the 2 Line: <br><br>1. At the opposite side of the plaza, take the adjacent elevator to the Downtown Redmond platform. <br>2. Go to the opposite side of the platform. <br>3. Take the elevator at Exit B2 (110th Ave NE) up to the plaza. <br>4. Take the elevators at the opposite side of the plaza down to the South Bellevue platform. <br><br>To exit the station: <br><br>1. Take the elevators at Exit B2 (110th Ave NE) to the street.

Tramvajus 2 Line
OK

norėdami palikti atsiliepimą, atlikite registraciją

numerių įvedimui reikia registracija


laikasmaršrutai